Slatted shed planning permission and TAMS 3 alignment

Under S.I. No. 649 of 2025 amending Class 6 of Schedule 2 Part 3, a single roofed animal housing structure up to 300 m² (and up to 450 m² aggregate across the yard) can be built without planning permission, provided it sits more than 100 m from any other house (unless written consent is signed), 10 m off public roads and outside protected habitats or flood zones.

How S.I. No. 649 of 2025 expanded Class 6 livestock exemptions to 300 m²/450 m², where full permission is mandatory, and how Section 5 supports TAMS approval.

Free, no obligation. One local builder prices it, not five.

  • 300 m²single Class 6 exempt limit
  • 450 m²aggregate holding exempt cap
  • 100 mdistance from neighbouring house
  • €80Section 5 written confirmation
Ear-tagged cattle feeding at a steel barrier inside a cattle house with a tractor behind

What changed under S.I. No. 649 of 2025 for Class 6 sheds

For over two decades, Irish farmers building an exempt slatted cattle or sheep shed were boxed into 200 m² for a single building and 300 m² across all Class 6 structures on the holding. S.I. No. 649 of 2025 lifted those ceilings by 50% to 300 m² for a single livestock building and 450 m² aggregate, letting many 3-bay and compact 4-bay slatted units avoid full planning delays when all siting conditions hold.

  1. Measure gross floor space accurately. Include the slatted pen, straw lie-back and covered feed passage under the roof footprint. Exceeding 300 m² by even 5 m² removes the exemption.
  2. Check prior Class 6 sheds on the farm. Any existing exempt livestock sheds within 100 m count toward the 450 m² aggregate cap.
  3. Respect the 100 m residential buffer. No exempt livestock shed may sit within 100 m of any dwelling (other than your own farmhouse), school, church or hospital without written consent.
  4. Road set-back, height and finish. Stay at least 10 m from a public road, stay under 8 m ridge height within 100 m of the road, and clad roofs and walls in dark green, dark grey or dark brown rather than bare bright metal.
  5. Effluent and clean-water separation. Clean roof water must discharge to soakaways or watercourses away from soiled yards, and slurry storage must comply with S.I. 113 of 2022.

Work out your slatted shed cost

Four quick taps and our bay-by-bay price shows before we ask for a phone number. One local farm shed builder rings you, not five.

4 bays suckler slatted shed, TAMS 3 still to decide: €96,000 to €130,800 ex VAT.

Step 1 of 5

Which slatted build are you pricing?

Pick the closest match. One builder checks exact spans on site.

How the bay-by-bay figure is worked out

The guide multiplies going Irish per-bay slatted build ranges (excavation, shuttered reinforced tank, gang slats, external agitation point, steel frame, cladding and penning) by bay count, ex VAT. When you select 40% or 60% TAMS 3, the indicative net figure deducts grant aid up to a single €90,000 investment ceiling; splitting slurry storage under the separate 60% Nutrient Storage ceiling or building as a registered farm partnership (€160,000 ceiling) increases grant support further. Rock breaking, high water tables, rubber slat mats and extra feed passage widths are priced when the builder walks the yard.

Six farmyard situations and planning outcomes

New 3-bay single-sided unit (~210 m²)

Planning status
Potentially exempt (under 300 m²)
Action before TAMS 3
Check 100 m house rule & total existing Class 6 m²; apply for Section 5.

New 4-bay single-sided unit (~280 m²)

Planning status
Close to 300 m² threshold
Action before TAMS 3
Measure gross external footprint including roof overhang; confirm via Section 5.

4-bay double-sided or 5-bay unit (360 m²+)

Planning status
Full planning permission needed
Action before TAMS 3
Lodge county council application before TAMS 3 tranche closes.

Slatted shed within 100 m of neighbour's house

Planning status
Exempt ONLY with signed consent
Action before TAMS 3
Get written consent from both owner and occupier, or apply for full permission.

Site in SAC, SPA, NHA or Flood Zone A/B

Planning status
Class 6 exemption disapplied
Action before TAMS 3
Full planning permission with Appropriate Assessment screening required.

Standalone unroofed slurry tank extension

Planning status
Separate Class 8/9 rules apply
Action before TAMS 3
Verify volume and distance rules with your agri advisor and county council.

Why TAMS 3 needs either full planning or a Section 5 letter

DAFM will not approve a TAMS 3 livestock housing or slurry storage application unless planning compliance is proved up front. If your slatted shed stays under 300 m² and meets every Class 6 condition, apply to your local authority for a Section 5 Declaration of Exemption. The statutory fee is €80 and the council has 4 weeks to issue a binding written ruling.

If you require full planning permission, allow 12 to 16 weeks for site notice, newspaper ad, 5-week submission window, 8-week decision and 4-week An Bord Pleanála appeal window before lodging final TAMS proof. Read the full grant rules in TAMS 3 40% and 60% grants. slattedsheds.ie is not DAFM, Teagasc or a government body and does not award TAMS 3 grants.

Common slatted shed questions

Does a 4-bay slatted shed need planning permission now?

A narrow 4-bay shed (19.2 m × 14.5 m = 278 m²) can fit inside the 300 m² Class 6 limit under S.I. No. 649 of 2025, provided aggregate Class 6 housing stays under 450 m² and all distance rules are met. A wider double-sided 4-bay unit needs full planning.

What counts toward the 450 m² aggregate limit?

All roofed Class 6 animal housing built under exemption in the same farmyard complex or within 100 m of it. Sheds built with full planning permission are generally excluded from the exempt cap, though always confirm via Section 5.

How much does a Section 5 exemption certificate cost?

The local authority application fee is €80, with a statutory decision timeline of 4 weeks once scaled drawings and site maps are lodged.

Can I lodge a TAMS 3 application while planning permission is pending?

DAFM requires proof of planning permission or a Section 5 declaration before issuing grant approval, and no construction work may begin until written TAMS approval is in hand.

Do I need planning for a slatted tank without a roof?

Unroofed slurry tanks fall under separate agricultural effluent storage provisions and still face the 100 m dwelling rule and Nitrates compliance checks. Confirm with your planner before digging.

All slatted shed pages and technical guides

Double-sided steel cattle shed with a wide central concrete feed passage and a tractor at the far gable

See your bay-by-bay cost before a builder rings

Pick the slatted shed layout, bay count, TAMS 3 rate and county. When you want a site quote, your outline goes to a single farm shed builder in your county.